Displaying 1 - 4 of 4

H2020 PONDERFUL: Pinkhill Meadow NBS: a small but highly valuable floodplain pondscape for biodiversity

One of the many ponds in the Pinkhill Meadow complex

This pondscape of newly created ponds is located in a floodplain meadow on Thames Water's Farmoor Reservoir property, on the banks of the River Thames, near Oxford. It was designed by Freshwater Habitats Trust to maximise freshwater biodiversity and has been closely monitored as a partnership since its creation in 1990.

The results show the exceptional value of the site for wetland plants, aquatic invertebrates, mammals, reptiles and birds, maintained over 35 years.


European demonstration site network for integrating biodiversity conservation into forest management

Marteloscope sites

The aim is to establish a network of demonstration sites covering a broad range of European forest types in which integrative forest management measures are being practiced. Having such sites will help train and eventually improve decision making capacities related to integrating biodiversity aspects into managed forests.


Green Roof and Water Management in Philippines Government Office Building

Quezon City, Philippines

Rapid urbanisation in the Philippines has given rise to many challenges as increasing infrastructure developments contribute to reduced open spaces and increased energy consumption.

Both the public and private construction sectors are responding by reshaping the cityscape and designing building structures that are as environmentally responsive as they are beautiful and compact. Now, buildings should not only be sturdy and spacious, they should also be efficient in energy consumption and adaptive to the changing environment.

LafargeHolcim Philippines (LafargeHolcim) has...


Park 500 Natural Treatment System

Tobacco farming, Virginia

The Park 500 Natural Treatment System (NTS) was constructed as a voluntary effort to provide a low-energy, low-maintenance alternative to reducing nitrogen and phosphorus in the process’s wastewater, which is high in nitrate-nitrogen, organic nitrogen and total phosphorus.

The project was initiated to reduce the environmental footprint of the tobacco production facility and help Philip Morris USA meet its environmental sustainability goals. The NTS reduces mass loading to the James River and creates a performance buffer for the existing plant discharge to ensure long-term...